A request has been received from Franklin Infrastructure for a temporary road closure to apply to a section of Bampton Road, whilst essential trenchless lining installation / repair works to the existing sewer on behalf of Thames Water works are carried out.
A Temporary Traffic Regulation Order (TTRO) is being made to implement the temporary closure and will operate from 29 August 2024 up to and including 18 September 2024. This is a 24 hour road closure.
(The maximum duration of a TTRO on a road is 18 months and on a footpath is 6 months, or until completion of the works, whichever is the earlier.)
Notice of intention to make the Order will be published in the local press.
A copy of the drawing showing the extent of the closure and also the alternative route for traffic is below along with the notice of closure: