18 February 2025
London Street, Faringdon – Road closure required to repair valve stem replace in carriageway by Thames Water: expected to finish on 19 February 2025.
18 February 2025
London Street, Faringdon – Road closure required to repair valve stem replace in carriageway by Thames Water: expected to finish on 19 February 2025.